ISO-Aligned Metrology
Zero-defect doctrine verified on every Wixom production run.
+/-0.0001"
dimensional tolerance threshold
100%
CMM inspection coverage
Inspection Metrics
24 hrs
CMM calibration verification cycle
AS9102
standard for first article inspection
ISO 9001
aligned quality management system
Verification Standards
Core inspection workflows for aerospace and automotive supply chains.
First Article Inspection
Gauge R&R Studies
Certified Mill Test Logging
Comprehensive AS9102 reporting formats verifying every ballooned print dimension against physical part geometry prior to full production release.
Rigorous repeatability and reproducibility analysis ensuring measurement system variation remains within tight industrial thresholds.
Heat-lot material certification and complete mill test reports archived digitally and shipped directly with every completed order batch.
Request sample inspection records and audit our Wixom facility.
Connect directly with our quality engineering desk to review compliance documentation or schedule an on-site audit.
