ISO-Aligned Metrology

Zero-defect doctrine verified on every Wixom production run.

Every dimension is verified against CAD models using automated coordinate measuring machines, optical comparators, and certified height gages before parts leave our floor.

+/-0.0001"

dimensional tolerance threshold

100%

CMM inspection coverage

Inspection Metrics

Calibration frequency and dimensional repeatability thresholds.

24 hrs

CMM calibration verification cycle

AS9102

standard for first article inspection

ISO 9001

aligned quality management system

Verification Standards

Core inspection workflows for aerospace and automotive supply chains.

First Article Inspection

Gauge R&R Studies

Certified Mill Test Logging

Comprehensive AS9102 reporting formats verifying every ballooned print dimension against physical part geometry prior to full production release.

Rigorous repeatability and reproducibility analysis ensuring measurement system variation remains within tight industrial thresholds.

Heat-lot material certification and complete mill test reports archived digitally and shipped directly with every completed order batch.

Request sample inspection records and audit our Wixom facility.

Connect directly with our quality engineering desk to review compliance documentation or schedule an on-site audit.